Send Message
Home ProductsDrill Stem Test Tools

Dst Drill Stem Test Pump System High Pressure Test Power Station Two Stage

Certification
China Techcore Oil Tools Co.,Ltd, certification
China Techcore Oil Tools Co.,Ltd, certification
Customer Reviews
During the DST-TCP operation, the APR tools we purchased worked stable, and we are happy to see the quick response for any technical issure and fast delivery for redress kits

—— Ahmed

We are satisfied with your tools after 5 runs successful operation. We highly appreciate to see the excellent performances in sealing capacity and thanks for the specialist technical support from you

—— Leon

I'm Online Chat Now

Dst Drill Stem Test Pump System High Pressure Test Power Station Two Stage

Dst Drill Stem Test Pump System High Pressure Test Power Station Two Stage
Dst Drill Stem Test Pump System High Pressure Test Power Station Two Stage Dst Drill Stem Test Pump System High Pressure Test Power Station Two Stage

Large Image :  Dst Drill Stem Test Pump System High Pressure Test Power Station Two Stage

Product Details:
Place of Origin: CHINA
Brand Name: Techcore
Certification: ISO, BV
Model Number: MHU-G10-G250-2500
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Polly wood, suitable for sea and air shipment
Delivery Time: 30-45 days
Supply Ability: 5 set/month

Dst Drill Stem Test Pump System High Pressure Test Power Station Two Stage

Description
Material: Alloy Steel Testing Pressure: 15000 Psi/ 105Mpa
Test Medium:: Clean Water Application: Drill Stem Testing Tools Pressure Testing
Type: Testing Pump Name: Drill Stem Test Tools
High Light:

dst drill stem test

,

well testing tools

Dst Drill Stem Test Pump System High Pressure Test Power Station Two Stage

 

Introduction of Test pump power station

 

The test pump is the test equipment that is used for DST tools High pressure test in factory for the DST tools pressure test and function test or at the oilsite before the DST run in the hole for the testing operation.

 

Operation of the testing pump power station


1)The station is a two-stage supercharging system which the low pressure pump is used to pre-charge and high pressure pump is used to pressurize. Open the driving air, and the low pressure pump
G10LVES starts to pre-charge, until the pressure balance.
2)The output pressure of HP Circuit is controlled by driving air regulating valve, and the real value is upto G250LVES pump's pressure ratio and the needed maximum outlet pressure.
3)Working pressure of the high pressure pump G250LVES's drive circuit could be changed by adjusting the drive air reducing valve, then you could reach different high pressure outlet to meet different
test and production requirements.

 

Technical Parameter of Pressure Test power station

 

1 Type of equipment: MHU-G10-G250-2500(100)-M08-3AV0
2 Pump Model: G250LVES, G10LVES, MAXIMATOR Germany
3 Test Medium: Clean water
4 Pressure Ratio: 1:265(G250LVES), 1:11(G10LVES)
5 Maximum output pressure of the pumps:

2650bar(G250LVES)

110bar(G10LVES)

6 Maximum output pressure of the unit:

2000bar

 

7 Outlet Flow: 0-18L/min
8 Driving air pressure: 8-10bar
9 Gas consumption: 400-2500Ln/min
10 Size of drive air inlet: RC 1/2 Femal
11 Size of high pressure outlet: UNF3/4-16 Femal

 

 

 

    Dst Drill Stem Test Pump System High Pressure Test Power Station Two Stage 0  Dst Drill Stem Test Pump System High Pressure Test Power Station Two Stage 1

 

Techcore Oil Tools expertise in manufacture of the Drill Stem Testing Tools for more than Ten years, the professional Reserch and Development (R&D) department improves the advanced technology in design of the Drill stem testing tools for well testing service.

 

* Techcore do the best to supply thoughtful and prompt after-sales service to guarantee for the customers' benefits

* Techcore supply the cost effect products with 12 months guarantee

* Techcore insist on the traceability of each Drill stem testing tools and related DST parts from the raw material to the finished products.

* Techcore insist on superior quality, strong packing & timely delivery.

 

The drill stem testing tools are applied in cased hole, open hole and slim hole well testing operation in high pressure and high temperature condition, The main DST tool string includes RTTS packer, circulating valve, safety joint, select tester valve, omni valve, hydraulic jar, shock absorber, RD safety circulating valve, high pressure retrievable packer with bypass, IPO valve, tubing string test valve, and so on.

 

Welcome to contact us for more information!

Contact Details
Techcore Oil Tools Co.,Ltd,

Contact Person: Mr. LEE

Tel: 0086 18161839623

Send your inquiry directly to us (0 / 3000)